Description


MME Multiurethanes’ technical crew supported a cement grouting program required to fill underground voids encountered under a factory facility.

A mix of non-shrink grout and water was pumped into 1 1/2’’ holes drilled into the void until the grout started flowing from the holes. This evidence and the use of a pressure gauge determined that the voids were successfully filled.