Location: North York, ON
Sector: Utilities
Description
Following a pipe’s abandonment, a utility contractor discovered a washed out area above the pipe with the potential to collapse in the future and create voids that could lead to a sinkhole. Structural void filling and permanent abandonment works were required.
A bulkhead was designed and installed to successfully fill the pipe and the void using a heavy cement slurry.