Description


Flowing water and soil erosion created unstable working conditions during the construction of a lakeside open-cut pedestrian tunnel. MME Multiurethanes technicial team responded with a chemical injection program to quickly fill the voids and cracks in the concrete walls and successfully resolve the water migration.