Location: Toronto, ON
Sector: Infrastructure
Description
Loose sand presented a risk of surface voids forming during a directional drilling project beneath an active airport apron. MME Multiurethanes engineers designed a grouting solution using sodium silicate, delivered through sleeve pipes, to stabilize soils in the high-risk area during directional drilling.