Description
Hydrotite CJ-3030 was installed in precast concrete panels in the construction of a headwall, as part of the overflow system at an oil sands facility. This application required the Hydrotite to be installed within tight tolerances to allow the precast panels to line-up correctly. Additionally, in order for the Hydrotite to be effective, it had to firmly adhere to the precast concrete surface.