Maqs is a grouting expert who has successfully completed hundreds of cellular, chemical, cement, soil stabilization and water-stop projects over his Multiurethanes career.
After leaks in underground vaults damaged sensitive equipment, Multiurethanes used an experienced confined space entry team to perform strategic polyurethane injection work to stop the leaks.
Performed the injection of concrete construction joints, leaking cracks and electrical conduits at a large gas-fired electrical power station using chemical grouts.
Water inflows through a caisson wall jeopardized a tunnel construction schedule. Multiurethanes designed and completed a chemical grouting program to stop the leaks and get the project back on schedule.
A building restoration contractor experienced water leakage into the mechanical room. Polyurethane resin was injected to fill the holes, forming a semi-rigid foam barrier and preventing further water leakage.
Provided cement grouting to fill voids and cracks in concrete walls to minimize water migration during the construction of a lakeside open-cut pedestrian tunnel.
Find Advice from Our Specialists for Your Grouting Projects