Fill stabilization around a manhole

Loose fill surrounding a manhole structure required stabilization using crack injection to stabilize the fill prior to cutting through the structure wall.

By |2022-09-19T07:19:27-04:0010:30 am|Chemical Grouting, Leak sealing, Soil Stabilization, Utilities|Comments Off on Fill stabilization around a manhole

Leak sealing in a Wastewater Municipal Project

Provided technical support for leak sealing work using Universal Resin at the Southeast Collector Trunk Sewer Project (SEC) for York and Durham Regions.

By |2022-09-19T07:33:03-04:002:58 pm|Chemical Grouting, Crack Injection, Leak sealing, Utilities|Comments Off on Leak sealing in a Wastewater Municipal Project

Chemical Grouting for Underground Utilities

After leaks in underground vaults damaged sensitive equipment, Multiurethanes used an experienced confined space entry team to perform strategic polyurethane injection work to stop the leaks.

By |2022-09-19T07:31:15-04:001:46 pm|Chemical Grouting, Crack Injection, Utilities, Water Cutoff|Comments Off on Chemical Grouting for Underground Utilities

Equipment Customization for Cement Grouting

Prepared customized electrical equipment for an underwater grouting project, including diesel generator and an electrical control panel with variable frequency drives to operate a colloidal mixer, agitator tanks and progressive cavity pumps.

By |2022-09-19T07:31:19-04:001:27 pm|Cement Grouting, Utilities|Comments Off on Equipment Customization for Cement Grouting

Soil Stabilization Program for Utility Contractor

Assisted a utility contractor in the implementation of a soil stabilization program when loose fill was encounter during excavation operations.

By |2022-09-19T07:31:28-04:001:46 pm|Cement Grouting, Soil Stabilization, Utilities|Comments Off on Soil Stabilization Program for Utility Contractor

Chemical Grouting to Stop Water Seepage into Utility Chamber

Engaged in water stop project to seal joints in precast underground utility chamber where infiltration was inevitable due to a high-water table.

By |2022-09-19T07:32:01-04:001:46 pm|Chemical Grouting, Utilities, Water Cutoff|Comments Off on Chemical Grouting to Stop Water Seepage into Utility Chamber