Fill stabilization around a manhole
Loose fill surrounding a manhole structure required stabilization using crack injection to stabilize the fill prior to cutting through the structure wall.
Contact Us: 1-800-663-6633
Loose fill surrounding a manhole structure required stabilization using crack injection to stabilize the fill prior to cutting through the structure wall.
Worked onsite in a water cut-off operation to seal active inflows through pre-cast manhole segments.
Performed microfine cement grouting and waterstop operations using polyurethane resins, and provided soil stabilization in cross passage tunnels along the road in a light rail transit (LRT) line construction project.
Our technical team developed a solution to lift train track crossings on wood ties by pressure grouting under the tracks. This new approach was fast, reliable and surprised the utility contractor, who had been looking for this solution for a long time.
Assisted with a chemical grouting operation to stop quicksand from leaking through a caisson wall.
Engaged on an energy transmission facility expansion project, performing a water cut-off operation in a tunnel shaft liner for a major utility company.
Provided technical support to stabilize extra-large construction joints (250 m long) on a dam rehabilitation project in Western Manitoba.
Provided soil stabilization for a complex tunnel project with several site restrictions including no drilling from surface and working in close proximity to sewer and water mains.
Performed crack injection work to provide a solution based on chemical grouting for a leaking underground chamber.
Provided technical support for leak sealing work using Universal Resin at the Southeast Collector Trunk Sewer Project (SEC) for York and Durham Regions.