Void Filling under Factory Facility
Supported a cement grouting program required to fill underground voids encountered under a factory facility.
Contact Us: 1-800-663-6633
Supported a cement grouting program required to fill underground voids encountered under a factory facility.
A building restoration contractor experienced water leakage into the mechanical room. Polyurethane resin was injected to fill the holes, forming a semi-rigid foam barrier and preventing further water leakage.
A bulkhead was designed and installed to successfully fill an abandoned pipe and voids using a heavy cement slurry.
The City of Toronto required Multiurethanes' technical expertise for an emergency cement grouting project to stabilize an undermined retaining wall over a 50 m length.
Assisted a utility contractor in the implementation of a soil stabilization program when loose fill was encounter during excavation operations.
Performed cement grout injection to fill voids and to stop water infiltration around the cross passage section in a tunnel.
Provided specialized on-site training to mining personnel on the inspection, servicing and maintenance of specialized cement grouting equipment.